- Atlantik Confidence – Expert Opinion
- Bulk Jupiter – Expert Opinion
- Decomissioning of Large Northern North Sea Platform
- Flinterstar Wreck Removal
- Heavy-Lift Transshipment Base Facility, Port of Burgas Upgrade
- Heavy-Lift Transshipment Base Facility, Port of HaminaKotka Upgrade
- Independent Witness for Experimental Jack-up Operations
- Project Cargo Risk Management Consultancy
- Sarens NV – Sundsvall Bridge – Liftpontoon
- Seafastening and Grillage Design
- Ship Speed Trial Verification
- Thornton Bank Wind Farm Phases 2 & 3
Thornton Bank Wind Farm Phases 2 & 3
Location:
Thornton Sandbank, Offshore Belgium
Project Description:
Installation of Wind Turbines and Offshore Transformer Station including laying and burying of cables.
Mwaves’ Role:
Full Scope of Marine Warranty Services for all offshore installation phases.
Activities:
Working with C-Power NV and their contractors to minimise the risk associated with offshore construction activities.
Work includes document reviews, vessel surveys and site attendance for the following:
- Loadout, transportation and installation for pin-piles, foundation jackets, towers and turbines;
- Installation of offshore transformer station platform;
- Cable spooling, lay, pull-in and trenching;
- Jack-up and vessel activities relating to construction.